# N.D. Cal. Patent L.R. 4-6 — Claim Construction Hearing

A published requirement of U.S. District Court, Northern District of California (California). Category: Local Rules. Verified against the official source (N.D. Cal. — Local Rules (U.S. District Court, Northern District of California)) on October 21, 2026.

## Summary

N.D. Cal. Patent L.R. 4-6 — Claim Construction Hearing: the court's own rule, verbatim from UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA PATENT LOCAL RULES (These Patent Local Rules take effect on December 1, 2009.), the court’s own page, sha-custodied. Court-level requirement: applies in every case before the U.S. District Court for the Northern District of California alongside the federal rules and any judge-specific procedures.

## Requirement

Subject to the convenience of the Court’s calendar, two weeks following submission of the reply brief specified in Patent L.R. 4-5(c), the Court shall conduct a Claim Construction Hearing, to the extent the parties or the Court believe a hearing is necessary for construction of the claims at issue.

## Source

- Page: https://benchpath.ai/rules/ca-fed-cand-pat-4-6
- Source: N.D. Cal. — Local Rules (U.S. District Court, Northern District of California)
- Official source: https://cand.uscourts.gov/rules-forms-fees/local-rules/patent-local-rules#rule=4-6
- Confidence: high
- Last verified: October 21, 2026

---

Procedural information from official public court sources. Not legal advice. A court can change its requirements without notice: read the cited source before relying on a record.

Published by BenchPath (LegalDraft Technologies LLC). How records are verified: https://benchpath.ai/methodology
