# S.D. Cal. Patent L.R. 4.5 — Claim Construction Hearing

A published requirement of U.S. District Court, Southern District of California (California). Category: Local Rules. Verified against the official source (S.D. Cal. — Local Rules (U.S. District Court, Southern District of California)) on October 21, 2026.

## Summary

S.D. Cal. Patent L.R. 4.5 — Claim Construction Hearing: the court's own rule, verbatim from United States District Court Southern District of California LOCAL RULES (Revised as of: June 1, 2026), official PDF, sha-custodied. Court-level requirement: applies in every case before the U.S. District Court for the Southern District of California alongside the federal rules and any judge-specific procedures.

## Requirement

Not later than twenty-eight (28) days after service of responsive briefs and subject to the convenience of
the Court’s calendar, the Court will conduct a Claim Construction Hearing, if the court believes a hearing
is necessary for construction of the claims at issue. The Court may also order in its discretion a tutorial
hearing, to occur before, or on the date of, the Claim Construction Hearing.
Attached as Appendix B is a timeline illustrating the exchange and filing deadlines set forth in these
Patent Local Rules.

## Source

- Page: https://benchpath.ai/rules/ca-fed-casd-pat-4p5
- Source: S.D. Cal. — Local Rules (U.S. District Court, Southern District of California)
- Official source: https://www.casd.uscourts.gov/_assets/pdf/rules/2026.06.01%20Local%20Rules.pdf#page=83&rule=4p5
- Confidence: high
- Last verified: October 21, 2026

---

Procedural information from official public court sources. Not legal advice. A court can change its requirements without notice: read the cited source before relying on a record.

Published by BenchPath (LegalDraft Technologies LLC). How records are verified: https://benchpath.ai/methodology
