Skip to main content

Gov. Code, § 14525.3 · Chapter 2. Duties

Gov. Code, § 14525.3

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

(a) To the extent consistent with federal law, the commission shall not program or allocate any state funds, including proceeds from the sale of general obligation bonds, under its jurisdiction for any new bulk coal terminal project proposed on or after January 1, 2017.

(b) (1) The commission shall evaluate each new terminal project before the commission to determine consistency with this section and also whether or not the purpose or intent of the new terminal project is to increase the state’s overall capacity to facilitate the transportation of coal in bulk, based on a review of the completed environmental documents and written confirmation from the lead agency of the project, as designated pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).

(2) A terminal project grantee of funds identified by the commission as subject to this section shall annually notify the commission that the project is not being used to handle, store, or transport coal in bulk.

(c) This section does not apply to a project or infrastructure already permitted as of January 1, 2016.

(d) For purposes of this section, the following definitions apply:

(1) (A) “New bulk coal terminal” means a terminal that stores, handles, or transports coal in bulk to a degree or significance that is categorized as having the potential for significant impacts in an environmental document prepared pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) as a result of the storage, handling, or transport of coal in bulk.

(B) “New bulk coal terminal” does not include a project that is designed for safety, rehabilitation, congestion reduction, modernization, maintenance, or repair of an existing operation or facility, including rail terminals, railyards, rail facilities, rail infrastructure, and rail right-of-way.

(2) (A) “Terminal project” or “terminal” means a yard, depot, or off-road or other facility that exchanges freight in bulk between transportation modes.

(B) “Terminal project” does not include a project that is designed for safety, rehabilitation, congestion reduction, modernization, maintenance, or repair of an existing operation or facility, including rail terminals, railyards, rail facilities, rail infrastructure, and rail right-of-way.

Notes and commentary — not statutory text

History

Added by Stats. 2016, Ch. 215, Sec. 2. (SB 1279) Effective January 1, 2017.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=14525.3.
Text hash
sha256 bd6a2eaa126e2da1503dea13e17d65882f1e94c1e09a765c71226d669cf6a67c
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.