Skip to main content

Gov. Code, § 65850.8 · Article 2. Adoption of Regulations

Gov. Code, § 65850.8

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

(a) (1) On or before September 30, 2018, every city, including a charter city, county, or city and county with a population of 200,000 or more residents, and on or before January 31, 2019, every city, including a charter city, county, or city and county with a population of less than 200,000 residents, shall make all documentation and forms associated with the permitting of advanced energy storage available on a publicly accessible Internet Web site, if the city, county, or city and county has an Internet Web site.

(2) The city, county, or city and county shall allow for electronic submission of a permit application and associated documentation. The city, county, or city and county shall also authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant, unless the city, county, or city and county determines that it is unable to accept an electronic signature on all forms, applications, and other documents and makes a finding that states the reasons for that inability.

(b) The Governor’s Office of Planning and Research may, in consultation with local building officials, the State Fire Marshal, the storage industry, labor representatives from the utility and construction industries, licensed electrical contractors, electrical corporations, publicly owned utilities, the Public Utilities Commission, and other stakeholders, provide guidance on energy storage permitting, including streamlining, best practices, and potential factors for consideration by local government in establishing fees for permitting and inspection.

(c) For purposes of this section, the following terms have the following meanings:

(1) “Advanced energy storage” means an energy storage system, as defined in Section 2835 of the Public Utilities Code, as well as an energy storage system that is designed to provide backup energy services in the event of a grid outage, that is limited to both of the following:

(A) Electrochemical energy storage in nonventing packages.

(B) Customer-sited installations.

(2) “Customer sited” means the system is interconnected to the electrical grid through an existing retail customer interconnection.

(3) “Electronic submittal” means the utilization of one or more of the following:

(A) Email.

(B) The Internet.

(C) Facsimile.

Notes and commentary — not statutory text

History

Added by Stats. 2017, Ch. 380, Sec. 2. (AB 546) Effective January 1, 2018.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65850.8.
Text hash
sha256 014baec8db18bc73f6292e7a6abbebf81ae0fb083fb3ee3eca07e9ccd4daadf6
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.