Skip to main content

Gov. Code, § 66632.2 · Chapter 4. Powers and Duties of the Commission

Gov. Code, § 66632.2

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

(a) The owner or operator of any public service facilities need not obtain a permit from the commission for the construction within or upon any public highway or street of any public service facilities to provide service to persons or property located within the area of the commission’s jurisdiction. The public service facilities referred to in this subdivision shall be limited to those which are necessary for and are customarily used to provide direct and immediate service to the persons or property requiring that service.

(b) The owner or operator of public service facilities or a public street or road located anywhere within the area of the commission’s jurisdiction may, without first obtaining a permit from the commission, make emergency repairs to those facilities as may be necessary to maintain service if the emergency requires repairs before an emergency permit can be obtained under subdivision (f) of Section 66632 and if that notification is given to the commission not later than the first working day following the undertaking.

(c) “Public service facilities,” as used in this section, means any facilities used or intended to be used to provide water, gas, electric, or communications service and any pipelines, and appurtenant facilities, for the collection or transmission of sewage, flood or storm waters, petroleum, gas, or any liquid or other substance.

(d) Any agency that intends to undertake, carry out, or approve an emergency project to maintain, repair, or restore an existing highway, as defined in Section 360 of the Vehicle Code, except for a highway designated as an official state scenic highway pursuant to Section 262 of the Streets and Highways Code, within the existing right-of-way of the highway, damaged as a result of fire, flood, storm, earthquake, land subsidence, gradual earth movement, or landslide, within one year of the damage, need not obtain a permit from the commission, if notification is given to the commission not later than the first working day following the commencement of the undertaking or action. This subdivision does not exempt from this section any agency that is required to obtain from the commission a permit to undertake, carry out, or approve a project to expand or widen a highway damaged by fire, flood, storm, earthquake, land subsidence, gradual earth movement, or landslide.

Notes and commentary — not statutory text

History

Amended by Stats. 1996, Ch. 825, Sec. 5. Effective January 1, 1997.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66632.2.
Text hash
sha256 ae5d85daf26c9aef303beeec92826215d172cb0b5d7647fe67cfc620bee4500c
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.