Skip to main content

Health & Saf. Code, § 16015 · Article 3. General Requirements and Administration

Health & Saf. Code, § 16015

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

All drawings and specifications shall be prepared under the responsible charge of an architect, civil engineer, or structural engineer, who shall sign all drawings and specifications for approval of the enforcement agency. Observation of the work of construction shall be under the general responsible charge of the same architect, civil engineer, or structural engineer when feasible, as determined by the enforcement agency, except that if drawings and specifications do not involve architectural or structural conditions, the drawings and specifications may be prepared and the work of construction may be administered by a registered professional engineer qualified in the branch of engineering that is appropriate to the drawings, specifications, estimates, and work of construction.

Notes and commentary — not statutory text

History

Added by Stats. 1985, Ch. 1521, Sec. 1.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=HSC&sectionNum=16015.
Text hash
sha256 036050cd9d350f85253f8d27e5f979bf9c682c9250758ca16e7a2fc7e4d63da8
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.