Health & Saf. Code, § 25202 · Article 9. Permitting of Facilities
Health & Saf. Code, § 25202
Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
(a) The owner or operator of a hazardous waste facility who holds a hazardous waste facilities permit or a grant of interim status shall comply with the conditions of the hazardous waste facilities permit or interim status document, the requirements of this chapter, and with the regulations adopted by the department pursuant to this chapter, including regulations which become effective after the issuance of the permit or grant of interim status.
Notwithstanding any term or condition in a hazardous waste facilities permit or interim status document, the department may adopt or amend regulations which impose additional or more stringent requirements than those existing at the time the permit or interim status document was issued. The department may enforce both the permit or interim status document and additional or more stringent requirements against the owner or operator of a facility.
(b) The amendment of this section made by Chapter 1126 of the Statutes of 1991 does not constitute a change in, but is declaratory of, the existing law.
Notes and commentary — not statutory text
History
Amended by Stats. 1996, Ch. 688, Sec. 1. Effective January 1, 1997.
Source of truth
- Edition
- As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
- Official file
- https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=HSC§ionNum=25202.
- Text hash
- sha256 7e2fa1b2653822ce5fead5ca6b9a929ee2c09d0fbce2e44ea9f722d7fb5a06f9
- Composed by
- compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.