(a) No district with an annual budget of less than one million dollars ($1,000,000) shall increase any existing fees for authority-to-construct permits or permits to operate by more than 30 percent in any calendar year, unless required to comply with the minimum fee requirements of Title V.

(b) No district with an annual budget of one million dollars ($1,000,000) or more shall increase any existing fees for authority-to-construct permits or permits to operate by more than 15 percent in any calendar year.

(c) Notwithstanding subdivision (b), this section shall not apply to the south coast district.

(d) (1) Notwithstanding subdivision (b), effective January 1, 1998, any of the San Diego County Air Pollution Control District’s individual fees for authority-to-construct permits and permits to operate may reflect the district’s actual costs, as determined by the district’s fee-for-service calculations.

(2) Notwithstanding paragraph (1) or subdivision (b), on and after January 1, 1999, the San Diego County Air Pollution Control District may increase any individual fees for authority-to-construct permits and permits to operate by more than 15 percent in any fiscal year only if the total, aggregate increase in existing fees for authority-to-construct permits and permits to operate does not exceed 15 percent in that fiscal year.

(3) (A) This subdivision shall remain operative so long as the San Diego County Air Pollution Control District continues to determine fees for authority-to-construct permits and permits to operate pursuant to a cost-based fee system in which all of the following requirements are met:

(i) Fees for authority-to-construct permits and permits to operate are specified for a minimum of 120 separate equipment and process categories.

(ii) Labor expended to issue authority-to-construct permits and permits to operate is tracked in increments of 0.5 hours or less for each of those categories.

(iii) The fees for authority-to-construct permits and permits to operate are determined from the costs of labor tracked in increments of 0.5 hours or less and other actual and projected costs related to permitted stationary sources.

(B) This subdivision shall become inoperative if, and at the time that, the San Diego district ceases to determine fees for authority-to-construct permits and permits to operate as specified in subparagraph (A).

Notes and commentary — not statutory text

History

Amended by Stats. 1997, Ch. 406, Sec. 1. Effective January 1, 1998.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=HSC&sectionNum=41512.7.
Text hash
sha256 6a5adaa1931809964ac4e72ac252084534a6f6e0674c47f61b43e59e0931dc72
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.