(a) Notwithstanding Section 20221, work on the Oakland Wye complex to the MacArthur Station project and on the Daly City turnback and storage facilities project may be performed by district personnel during periods of operation of the transit system when interconnection work is to be performed within 12 feet of the centerline of the existing track.
(b) Notwithstanding Section 20221, interconnection work required for the Dublin-Pleasanton Extension, Warm Springs Extension, Pittsburg-Antioch Extension, Colma-San Francisco Airport Extensions, and work required by Department of Transportation retrofit or replacement projects may be performed by district personnel when the work is to be performed within 12 feet of the centerline of existing track or where the tie-in or startup of the work could affect operating train control, traction power, electrical control, or communications systems and the district has determined that there is a clear risk to safety of personnel or to passenger service which requires that district personnel perform the work.
(c) Notwithstanding subdivisions (a) and (b), it shall continue to be the policy of the district to perform all interconnection work by competitive bidding.
Notes and commentary — not statutory text
History
Amended by Stats. 1991, Ch. 168, Sec. 1.
Source of truth
- Edition
- As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
- Official file
- https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PCC§ionNum=20228.
- Text hash
- sha256 1ed55367c5212bd276dc28c66e08e9f9bc778172c4835e4e9389d0e1e3cfcf0b
- Composed by
- compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Public Contract Code
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.