Pub. Contract Code, § 22199.5 · Chapter 4.9. Construction Manager/General Contractor Project Delivery Program
Pub. Contract Code, § 22199.5
Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
As used in this chapter:
(a) “Best value” means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project.
(b) “Construction manager” means a partnership, corporation, or other legal entity that is a licensed contractor pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code and that is able to provide appropriately licensed contracting and engineering services as needed pursuant to a Construction Manager/General Contractor method contract.
(c) “Construction Manager/General Contractor method” means a project delivery method in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The contract for construction services may be entered into at the same time as the contract for preconstruction services or at a later time. The execution of the design and the construction of the project may be in sequential phases or concurrent phases.
(d) “Local agency” means a city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source.
(e) “Preconstruction services” means advice during the design phase, including, but not limited to, scheduling, pricing, and phasing to assist the local agency to design a more constructible project.
(f) “Project” means a public work necessary for the construction of a recycled water facility or infrastructure designed specifically to alleviate water shortages attributable to drought, climate change, or other environmental factors.
Notes and commentary — not statutory text
History
Added by Stats. 2025, Ch. 655, Sec. 1. (SB 598) Effective January 1, 2026. Inoperative January 1, 2031, pursuant to Section 22199.6.
Source of truth
- Edition
- As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
- Official file
- https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PCC§ionNum=22199.5.
- Text hash
- sha256 09e273f1400f312d3424b90809cfaea23105fc0d3750734c735f228026708662
- Composed by
- compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.