Skip to main content

Pub. Resources Code, § 21080.70 · Chapter 2.6. General

Pub. Resources Code, § 21080.70

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

(a) This division does not apply to a project that consists of the development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, if all of the following conditions are met:

(1) The project has been evaluated in a prior project-level environmental impact report prepared pursuant to this division and that prior report evaluated one or more similar high-speed rail maintenance facility sites.

(2) The project incorporates all applicable mitigation measures identified in those prior project-level environmental impact reports.

(3) The project site is located within one mile of rail right-of-way approved for high-speed rail service.

(b) This division does not apply to a project that consists of the development, construction, or modification of a proposed passenger rail station, or design changes to a passenger rail station, for the purpose of serving electrically powered high-speed rail, if both of the following conditions are met:

(1) The station or station design change is located within the resource study area of a previously certified environmental impact report prepared pursuant to this division for a high-speed rail or passenger rail project.

(2) The project incorporates all applicable mitigation measures identified in the previously certified environmental impact report.

(c) For purposes of this section, “high-speed rail” means the California high-speed rail project and other high-speed rail projects in California that are planned to directly connect to the California high-speed rail project.

(d) This section does not apply to any project on or within natural and protected lands as defined in Section 21067.5.

(e) The exemptions provided in subdivisions (a) and (b) shall apply exclusively to projects described in those subdivisions and do not exempt any other facilities, structures, or uses not expressly identified. Any other project uses shall be subject to this division unless independently exempt under a separate provision of law.

Notes and commentary — not statutory text

History

Added by Stats. 2025, Ch. 24, Sec. 16. (SB 131) Effective June 30, 2025.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PRC&sectionNum=21080.70.
Text hash
sha256 272a038b8738c3a1de209583533ae5c7d21ef00ff7901b626dccbf68c1528ec7
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.