Pub. Util. Code, § 1005 · Article 1. Specified Utilities
Pub. Util. Code, § 1005
Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
(a) The commission may, with or without hearing, issue the certificate as prayed for, or refuse to issue it, or issue it for the construction of a portion only of the contemplated street railroad line, plant, or system, or extension thereof, or for the partial exercise only of the right or privilege, and may attach to the exercise of the rights granted by the certificate such terms and conditions, including provisions for the acquisition by the public of the franchise or permit and all rights acquired thereunder and all works constructed or maintained by authority thereof, as in its judgment the public convenience and necessity require; provided, however, upon timely application for a hearing by any person entitled to be heard thereat, the commission, before issuing or refusing to issue the certificate, shall hold a hearing thereon.
(b) When the commission issues a certificate for the new construction of a gas or electric plant, line, or extension, the certificate shall specify the operating and cost characteristics of the plant, line, or extension, including, but not limited to, the size, capacity, cost, and all other characteristics of the plant, line, or extension which are specified in the information which the gas and electrical corporations are required to submit, pursuant to Section 1003 or 1003. 5.
Notes and commentary — not statutory text
History
Amended by Stats. 1982, Ch. 1253, Sec. 4.
Source of truth
- Edition
- As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
- Official file
- https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC§ionNum=1005.
- Text hash
- sha256 179525cfda314a1c701691901e19a31d1b26ee120448ecc62fae2df697d3a8e9
- Composed by
- compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Public Utilities Code
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.