Skip to main content

Pub. Util. Code, § 132635 · Chapter 7. Exposition Metro Line Construction Authority

Pub. Util. Code, § 132635

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

The authority shall enter into a memorandum of understanding with the LACMTA that shall specifically address the ability of the LACMTA to review any significant changes in the scope of the design or construction, or both design and construction, of the project. For purposes of this section, the term “significant change” means any change of mode or technology, or any other substantive change that affects the connectivity and operation of the project as part of the overall transit system operated by the LACMTA, or any combination of those things. Design and construction of a light rail project that is consistent with the current scope of the project shall not be deemed to be a significant change in the scope of the project and shall not require concurrence by the LACMTA.

Notes and commentary — not statutory text

History

Added by Stats. 2003, Ch. 827, Sec. 1. Effective January 1, 2004.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=132635.
Text hash
sha256 9f86ad8a6452afae7e42a52e4d00b5ed529654ea9832fa822e01c35cba67c88a
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.