Pub. Util. Code, § 2811 · Article 2. Interconnection of Facilities

Pub. Util. Code, § 2811

Verbatim from the official edition

Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)

In order to promote the more efficient use and distribution of natural gas or electric energy and eliminate the necessity for construction of transmission facilities for gas or electricity produced by a private energy producer separate from those which may already exist to serve the same area and are owned and operated by a public utility subject to the jurisdiction and control of the Public Utilities Commission, the commission shall authorize the construction of an interconnection by a private energy producer upon application of such producer if the commission makes the findings required by Sections 2812 and 2812.5. The commission shall render its decision on any application filed pursuant to this chapter within 180 days of receipt of the application or at such later time as may be mutually agreed upon by the commission, the applicant, and the interconnecting public utility.

Notes and commentary — not statutory text

History

Amended by Stats. 1980, Ch. 987, Sec. 2.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=2811.
Text hash
sha256 9fe2dc5437f29cee224d62fa0aec838b5a9447a5b33a002394cf5dd074bdf9a4
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.