Pub. Util. Code, § 2840.2 · Article 1. Waste Heat and Carbon Emissions Reduction Act
Pub. Util. Code, § 2840.2
Text — As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
For purposes of this article, the following terms have the following meanings:
(a) “Combined heat and power system” means a system that produces both electricity and thermal energy for heating or cooling from a single fuel input that meets all of the following:
(1) Is interconnected to, and operates in parallel with, the electrical transmission and distribution grid.
(2) Is sized to meet the eligible customer-generator’s onsite thermal demand.
(3) Meets the efficiency standards of subdivisions (a) and (d) of, and the greenhouse gases emissions performance standard of subdivision (f) of, Section 2843.
(b) “Eligible customer-generator” means a customer of an electrical corporation that meets both of the following requirements:
(1) Uses a combined heat and power system with a generating capacity of not more than 20 megawatts, that first commences operation on or after January 1, 2008.
(2) Uses a time-of-use meter capable of registering the flow of electricity in two directions. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the electricity flow calculations shall yield a result identical to that of a time-of-use meter.
(c) “Excess electricity” means the net electricity exported to the electrical grid, generated by a combined heat and power system that is in compliance with Section 2843.
(d) “Greenhouse gas” or “greenhouse gases” includes all of the following gases: carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
Notes and commentary — not statutory text
History
Amended by Stats. 2019, Ch. 396, Sec. 36. (AB 1513) Effective January 1, 2020.
Source of truth
- Edition
- As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
- Official file
- https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC§ionNum=2840.2.
- Text hash
- sha256 4ef504d5a77bb6bd3467afac91bee197aba764ebbd714d1dfb8c1d09736688cf
- Composed by
- compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Public Utilities Code
Cited by 1 provision
Provisions in this library whose text cites Pub. Util. Code, § 2840.2. Each shows the citation as that text prints it.
Public Resources Code
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.