(a) (1) The commission shall, in an existing or a new proceeding, develop methodologies for allocating electrical system integration resource procurement needs to each load-serving entity, as defined in Section 380, based on the contribution of the load-serving entity’s load and resource portfolio to the electrical system conditions that created the need for the procurement and for determining any costs resulting from a failure of a load-serving entity to satisfy its allocated procurement needs. Those needs and costs shall be limited to those that are subject to the commission’s jurisdiction pursuant to Section 380, 454.51, or 454.52.

(2) The electrical system integration resource procurement needs and costs described in paragraph (1) shall include, but are not limited to, those relating to the following:

(A) Resource adequacy requirements associated with system flexibility, as described in subdivision (c) of Section 380.

(B) Integration resources identified as needed, or proposed in response to system operational needs identified, through the process described in subdivision (a) of Section 454.51.

(b) The commission shall use the methodologies developed pursuant to subdivision (a) in allocating electrical system integration resource procurement needs and any costs resulting from a failure to procure resources to satisfy those allocated procurement needs pursuant to Section 380, 454.51, or 454.52.

(c) For purposes of this section, “electrical system integration resources” means resources that provide certain electrical system integration functions, benefits, or attributes, such as flexible ramping capability.

(d) This section does not require the procurement of a specific resource or technology type.

Notes and commentary — not statutory text

History

Added by Stats. 2019, Ch. 397, Sec. 2. (AB 1584) Effective January 1, 2020.

Source of truth

Edition
As published in the Legislative Counsel's database, tables dated October 18, 2026 (pubinfo_2025.zip)
Official file
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=397.
Text hash
sha256 ea89e7aae2f466a0bd93d555dc510cd801dba95d688ce626c04b6941056425d9
Composed by
compose_ca.py 2026-10-22: the Legislative Counsel's CAML content files read by a tokenizer (caml_readers.reader_a); an independent xml.etree reading (caml_readers.reader_b) agrees on every section

This section cites

Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.

Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.