Tex. Gov't Code § 2166.203 · Subchapter E. PRIVATE DESIGN PROFESSIONALS
INTERVIEW NOTIFICATION TO PRIVATE DESIGN PROFESSIONAL.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) Except as provided by Subsection (b), the commission shall notify a private design professional selected for an interview on a project of the person's selection not later than the 30th day before the date of the interview to allow preparation for the interview.
(b) The commission shall notify a private design professional selected for an interview on a small construction project of the person's selection not later than the 14th day before the date of the interview to allow preparation for the interview.
(c) Subsections (a) and (b) do not apply in an emergency situation that:
(1) presents an imminent peril to the public health, safety, or welfare;
(2) presents an imminent peril to property;
(3) requires expeditious action to prevent a hazard to life, health, safety, welfare, or property; or
(4) requires expeditious action to avoid undue additional cost to the state.
Notes and commentary — not statutory text
History
Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995. Amended by Acts 1997, 75th Leg., ch. 1329, Sec. 2, eff. Sept. 1, 1997.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2166.htm
- Text hash
- sha256 48cf39e7b6ddc00cecbd0fb3a6bab49795cb796336b8b24a91f51905badc01c4
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.