Tex. Health & Safety Code § 223.038 · Subchapter C. HOSPITAL PROJECT BONDS
COST OF CERTAIN REQUIRED ALTERATIONS.
Text — Current through the 89th 2nd Called Legislative Session, 2025
The relocation, raising, lowering, rerouting, changing of grade, or altering of construction of a highway, railroad, electric transmission line, telegraph or telephone property or facility, or pipeline made necessary by the actions of an issuer shall be accomplished at the sole expense of the issuer or nonprofit organization, which shall pay the cost of the required activity as necessary to provide comparable replacement, minus the net salvage value of any replaced facility. The issuer shall pay that amount from the proceeds of the bonds.
Notes and commentary — not statutory text
History
Acts 1989, 71st Leg., ch. 678, Sec. 1, eff. Sept. 1, 1989.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/HS/htm/HS.223.htm
- Text hash
- sha256 0446f5cd5bfbea88d4adb795a9c6f280de9805b4bcbff8b339dd8cbc855d90d8
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.