Tex. Loc. Gov't Code § 399.011 · Chapter 399. MUNICIPAL AND COUNTY WATER AND ENERGY IMPROVEMENT REGIONS
REVIEW REQUIRED.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) A program established under this chapter must require for each proposed qualified project:
(1) a review of water or energy baseline conditions and the projected water or energy savings to establish the projected water or energy savings; and
(2) a verification that a proposed qualified improvement meets the requirements of a qualified project.
(a-1) A verification provided as required under Subsection (a)(2) conclusively establishes that the improvement is a qualified improvement and the project is a qualified project.
(b) After a qualified project is completed, the local government shall require written verification that the qualified project was properly completed and is operating as intended.
(c) A baseline water or energy review or verification review under this section must be conducted by an independent third party.
Notes and commentary — not statutory text
History
Added by Acts 2013, 83rd Leg., R.S., Ch. 416 (S.B. 385), Sec. 1, eff. June 14, 2013.
Amended by:
Acts 2015, 84th Leg., R.S., Ch. 577 (H.B. 3187), Sec. 6, eff. June 16, 2015.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/LG/htm/LG.399.htm
- Text hash
- sha256 792375b83f121a866da04fdc8d15cb3b325c3046dcadb64f2691a7e92016e1be
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Cited by 2 provisions
Provisions in this library whose text cites Tex. Loc. Gov't Code § 399.011. Each shows the citation as that text prints it.
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.