Tex. Transp. Code § 225.0401 · Subchapter B. SPECIFIC STATE HIGHWAY NAMES
EL CAMINO EAST/WEST CORRIDOR.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) The parts of State Highways 7, 21, and 103, United States Highway 290, and Interstate Highway 10 that create a route from the Pendleton Bridge in Sabine County to the El Paso-Hudspeth County line are designated as the El Camino East/West Corridor.
(b) The part of Interstate Highway 10 that follows the route of the El Camino Real de Tierra Adentro in El Paso County is designated as the El Camino Real de Tierra Adentro East/West Corridor.
(c) To the extent the El Camino East/West Commission reimburses the department for the department's costs, the department shall:
(1) design and construct markers in consultation with the El Camino East/West Commission to be placed along the corridor indicating the highway number, the appropriate designation, and any other appropriate information; and
(2) erect a marker at each end of the corridor and at appropriate intermediate sites along the corridor.
(d) Funds collected by the department under Subsection (c) shall be deposited to the credit of the state highway fund.
Notes and commentary — not statutory text
History
Added by Acts 2005, 79th Leg., Ch. 937 (H.B. 747), Sec. 1, eff. September 1, 2005.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/TN/htm/TN.225.htm
- Text hash
- sha256 eb33076efa7b2f643b19153abdec539b082ecbeaa196cd39e028548ab06469e8
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.