Tex. Util. Code § 121.452 · Subchapter I. SOUR GAS PIPELINE FACILITIES
APPLICABILITY.
Text — Current through the 89th 2nd Called Legislative Session, 2025
This subchapter does not apply to:
(1) an extension of an existing sour gas pipeline facility that is in compliance with the railroad commission's rules for oil, gas, or geothermal resource operation in a hydrogen sulfide area if:
(A) the extension is not longer than five miles;
(B) the nominal pipe size is not larger than six inches in diameter; and
(C) the railroad commission is given notice of the construction of the extension not later than 24 hours before the start of construction;
(2) a new or an extension of a low-pressure gathering system; or
(3) an interstate gas pipeline facility, as defined by 49 U.S.C. Section 60101 and its subsequent amendments or a succeeding law, that is used for the transportation of sour gas.
Notes and commentary — not statutory text
History
Added by Acts 1999, 76th Leg., ch. 62, Sec. 18.13(a), eff. Sept. 1, 1999.
Amended by:
Acts 2013, 83rd Leg., R.S., Ch. 1177 (S.B. 901), Sec. 12, eff. September 1, 2013.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/UT/htm/UT.121.htm
- Text hash
- sha256 8fc94058401e32a57121c7392a4ccf40c899f325a222b8dc8d122075042883bb
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.