Tex. Util. Code § 35.004 · Subchapter A. COMPETITION AND TRANSMISSION ACCESS IN THE WHOLESALE MARKET
PROVISION OF TRANSMISSION SERVICE.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) An electric utility or transmission and distribution utility that owns or operates transmission facilities shall provide wholesale transmission service at rates and terms, including terms of access, that are comparable to the rates and terms of the utility's own use of its system.
(b) The commission shall ensure that an electric utility or transmission and distribution utility provides nondiscriminatory access to wholesale transmission service for qualifying facilities, exempt wholesale generators, power marketers, power generation companies, retail electric providers, and other electric utilities or transmission and distribution utilities.
(c) When an electric utility, electric cooperative, or transmission and distribution utility provides wholesale transmission service within ERCOT at the request of a third party, the commission shall ensure that the utility recovers the utility's reasonable costs in providing wholesale transmission services necessary for the transaction from the entity for which the transmission is provided so that the utility's other customers do not bear the costs of the service.
(c-1) The commission by rule shall ensure that a large load customer who is subject to the standards adopted under Section 37.0561 contributes to the recovery of the interconnecting electric utility's costs to interconnect the large load to the utility's system.
(c-2) An electric cooperative or municipally owned utility that has not adopted customer choice shall pass through to a large load customer who is subject to the standards adopted under Section 37.0561 the reasonable costs to interconnect the large load in a manner determined by the electric cooperative or municipally owned utility.
(d) The commission shall price wholesale transmission services within ERCOT based on the postage stamp method of pricing under which a transmission-owning utility's rate is based on the ERCOT utilities' combined annual costs of transmission, other than costs described by Subsections (d-2) and (d-3), divided by the total demand placed on the combined transmission systems of all such transmission-owning utilities within a power region. An electric utility subject to the freeze period imposed by Section 39.052 may treat transmission costs in excess of transmission revenues during the freeze period as an expense for purposes of determining annual costs in the annual report filed under Section 39.257. Notwithstanding Section 36.201, the commission may approve wholesale rates that may be periodically adjusted to ensure timely recovery of transmission investment. Notwithstanding Section 36.054(a), if the commission determines that conditions warrant the action, the commission may authorize the inclusion of construction work in progress in the rate base for transmission investment required by the commission under Section 39.203(e).
(d-1) The commission by rule shall establish a reasonable allowance for transmission-owning utility costs incurred to interconnect generation resources directly with the ERCOT transmission system at transmission voltage. The allowance must take into account:
(1) the potential to reduce the costs to consumers of generation interconnection;
(2) historical generation interconnection costs; and
(3) any other factor that the commission considers reasonable to accomplish the goal of this subsection.
(d-2) Costs in excess of the transmission-owning utility allowance provided by Subsection (d-1) incurred to interconnect generation resources with the ERCOT transmission system must be directly assigned to and collected from the generation resource interconnecting through the facilities.
(d-3) Not later than September 1 of every fifth year, the commission shall review and may adjust the allowance provided by Subsection (d-1) to account for inflation or supply chain issues.
(e) In this section, "ancillary services" means services necessary to facilitate the transmission of electric energy including load following, standby power, backup power, reactive power, and any other services as the commission may determine by rule.
(f) The commission shall ensure that ancillary services necessary to facilitate the transmission of electric energy are available at reasonable prices with terms and conditions that are not unreasonably preferential, prejudicial, discriminatory, predatory, or anticompetitive. On the introduction of customer choice in the ERCOT power region, acquisition of generation-related ancillary services on a nondiscriminatory basis by the independent organization in ERCOT on behalf of entities selling electricity at retail shall be deemed to meet the requirements of this subsection.
(g) The commission shall:
(1) review the type, volume, and cost of ancillary services to determine whether those services will continue to meet the needs of the electricity market in the ERCOT power region; and
(2) evaluate whether additional services are needed for reliability in the ERCOT power region while providing adequate incentives for dispatchable generation.
(h) The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to modify the design, procurement, and cost allocation of ancillary services for the region in a manner consistent with cost-causation principles and on a nondiscriminatory basis.
Notes and commentary — not statutory text
History
Acts 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997. Amended by Acts 1999, 76th Leg., ch. 405, Sec. 17, eff. Sept. 1, 1999; Acts 2003, 78th Leg., ch. 295, Sec. 1, eff. June 18, 2003.
Amended by:
Acts 2021, 87th Leg., R.S., Ch. 426 (S.B. 3), Sec. 14, eff. June 8, 2021.
Acts 2023, 88th Leg., R.S., Ch. 410 (H.B. 1500), Sec. 9, eff. September 1, 2023.
Acts 2025, 89th Leg., R.S., Ch. 953 (S.B. 6), Sec. 1, eff. June 20, 2025.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/UT/htm/UT.35.htm
- Text hash
- sha256 4b3d19fa18cf2ab9170574d14044bda76840c73c5487ee32b2c55ca810097a35
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Utilities Code
- Tex. Util. Code § 36.054CONSTRUCTION WORK IN PROGRESS.Printed as Section 36.054(a)
- Tex. Util. Code § 36.201AUTOMATIC ADJUSTMENT FOR CHANGES IN COSTS.Printed as Section 36.201
- Tex. Util. Code § 37.0561PLANNING FOR AND INTERCONNECTION OF LARGE LOADS.Printed as Section 37.0561
- Tex. Util. Code § 39.052FREEZE ON EXISTING RETAIL BASE RATE TARIFFS.Printed as Section 39.052
- Tex. Util. Code § 39.151ESSENTIAL ORGANIZATIONS.Printed as Section 39.151
- Tex. Util. Code § 39.203TRANSMISSION AND DISTRIBUTION SERVICE.Printed as Section 39.203(e)
- Tex. Util. Code § 39.257ANNUAL REPORT.Printed as Section 39.257
Cited by 6 provisions
Provisions in this library whose text cites Tex. Util. Code § 35.004. Each shows the citation as that text prints it.
Utilities Code
- Tex. Util. Code § 36.210PERIODIC RATE ADJUSTMENTS.Printed as Section 35.004(d)
- Tex. Util. Code § 36.216SINGLE CAPITAL INVESTMENT PROCEDURE FOR CERTAIN UTILITIES.Printed as Section 35.004
- Tex. Util. Code § 36.403STANDARDS AND PROCEDURES GOVERNING SECURITIZATION AND RECOVERY OF SYSTEM RESTORATION COSTS.Printed as Section 35.004
- Tex. Util. Code § 39.1593COST ALLOCATION OF RELIABILITY SERVICES.Printed as Section 35.004(h)
- Tex. Util. Code § 39.257ANNUAL REPORT.Printed as Sections 35.004, 35.006, and 35.007
- Tex. Util. Code § 39.258ANNUAL REPORT: DETERMINATION OF ANNUAL COSTS.Printed as Sections 35.004, 35.006, and 35.007
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.