Tex. Util. Code § 39.253 · Subchapter F. RECOVERY OF STRANDED COSTS THROUGH COMPETITION TRANSITION CHARGE
ALLOCATION OF STRANDED COSTS.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) Any capital costs incurred by an electric utility to improve air quality under Section 39.263 or 39.264 that are included in a utility's invested capital in accordance with those sections shall be allocated among customer classes as follows:
(1) 50 percent of those costs shall be allocated in accordance with the methodology used to allocate the costs of the underlying assets in the electric utility's most recent commission order addressing rate design; and
(2) the remainder shall be allocated on the basis of the energy consumption of the customer classes.
(b) All other retail stranded costs shall be allocated among retail customer classes in accordance with Subsections (c)-(i).
(c) The allocation to the residential class shall be determined by allocating to all customer classes 50 percent of the stranded costs in accordance with the methodology used to allocate the costs of the underlying assets in the electric utility's most recent commission order addressing rate design and allocating the remainder of the stranded costs on the basis of the energy consumption of the classes.
(d) After the allocation to the residential class required by Subsection (c) has been calculated, the remaining stranded costs shall be allocated to the remaining customer classes in accordance with the methodology used to allocate the costs of the underlying assets in the electric utility's most recent commission order addressing rate design. Non-firm industrial customers shall be allocated stranded costs equal to 150 percent of the amount allocated to that class.
(e) After the allocation to the residential class required by Subsection (c) and the allocation to the nonfirm industrial class required by Subsection (d) have been calculated, the remaining stranded costs shall be allocated to the remaining customer classes in accordance with the methodology used to allocate the costs of the underlying assets in the electric utility's most recent commission order addressing rate design.
(f) Notwithstanding any other provision of this section, to the extent that the total retail stranded costs, including regulatory assets, of investor-owned utilities exceed $5 billion on a statewide basis, any stranded costs in excess of $5 billion shall be allocated among retail customer classes in accordance with the methodology used to allocate the costs of the underlying assets in the electric utility's most recent commission order addressing rate design.
(g) The energy consumption of the customer classes used in Subsections (a)(2) and (c) shall be based on the relevant class characteristics as of May 1, 1999, adjusted for normal weather conditions.
(h) For purposes of this section, "stranded costs" includes regulatory assets.
(i) Except as provided by Section 39.262(k), no customer or customer class may avoid the obligation to pay the amount of stranded costs allocated to that customer class.
Notes and commentary — not statutory text
History
Added by Acts 1999, 76th Leg., ch. 405, Sec. 39, eff. Sept. 1, 1999.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm
- Text hash
- sha256 c90778cf6edab615d26fdffc6c00ae9e473ffe3e87d2db76ac31ce0c07a5cf12
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
This section cites
Provisions in this library that the text above cites, as it prints each citation. A range cited as “ss. 61.13-61.16” links its first and last provisions.
Utilities Code
Cited by 1 provision
Provisions in this library whose text cites Tex. Util. Code § 39.253. Each shows the citation as that text prints it.
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.