Tex. Water Code § 27.155 · Subchapter G. AQUIFER STORAGE AND RECOVERY PROJECTS
REPORTING OF INJECTION AND RECOVERY VOLUMES.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) A project operator shall install a meter on each ASR injection well and ASR recovery well associated with the aquifer storage and recovery project.
(b) Each calendar month, the project operator shall provide to the commission a written or electronic report showing for the preceding calendar month the volume of water:
(1) injected for storage; and
(2) recovered for beneficial use.
Notes and commentary — not statutory text
History
Added by Acts 2015, 84th Leg., R.S., Ch. 505 (H.B. 655), Sec. 3, eff. June 16, 2015.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/WA/htm/WA.27.htm
- Text hash
- sha256 d28693c2e4f785796dc2642dc0432dc71fa1830cbc3a57c89e8d5348713fc2c5
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Cited by 1 provision
Provisions in this library whose text cites Tex. Water Code § 27.155. Each shows the citation as that text prints it.
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.