Tex. Water Code § 28.034 · Subchapter C. DRILLED OR MINED SHAFTS
GEOPHYSICAL AND DRILLING LOG.
Text — Current through the 89th 2nd Called Legislative Session, 2025
If the shaft is to be constructed over, around, or within 2,000 feet of an existing drilled borehole or boreholes, the commission shall require the applicant for a shaft permit to furnish such geophysical logs as may be required by the commission, including electric logs, and the drilling log and well completion record of all existing boreholes to the commission, along with a complete and accurate core data record of the depth, thickness, and character of the different strata or rock units penetrated as a part of the shaft application.
Notes and commentary — not statutory text
History
Added by Acts 1983, 68th Leg., p. 651, ch. 148, Sec. 1, eff. May 18, 1983. Amended by Acts 1985, 69th Leg., ch. 795, Sec. 1.127, eff. Sept. 1, 1985.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/WA/htm/WA.28.htm
- Text hash
- sha256 0b45b176146c06d9cfc95d6b652a444ce51166665dc2ff171ccc6e3c45a80586
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.