Tex. Water Code § 49.277 · Subchapter I. CONSTRUCTION, EQUIPMENT, MATERIALS, AND MACHINERY CONTRACTS
INSPECTION OF AND REPORTS ON CONSTRUCTION WORK.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) The board shall have control of construction work being done for the district under contract to determine whether or not the contract is being fulfilled and shall have the construction work inspected by the district engineer or other designated person.
(b) During the progress of the construction work, the district engineer or other designated person shall submit to the board detailed written reports showing whether or not the contractor is complying with the contract, and when the work is completed the district engineer shall submit to the board a final detailed report including as-built plans of the facilities showing whether or not the contractor has fully complied with the contract.
Notes and commentary — not statutory text
History
Added by Acts 1995, 74th Leg., ch. 715, Sec. 2, eff. Sept. 1, 1995.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/WA/htm/WA.49.htm
- Text hash
- sha256 81776ac93c304451823354efe9cc11ae935431ccbae8fb7855db12c117303c23
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.