Tex. Water Code § 51.157 · Subchapter D. POWERS AND DUTIES
CONSTRUCTION CHARGES UNDER A CONTRACT WITH THE UNITED STATES.
Verbatim from the official edition
Text — Current through the 89th 2nd Called Legislative Session, 2025
The construction charges under a contract with the United States may include the cost of drainage and flood-control works necessary to control floods or to maintain the irrigability of district land, and the cost of incidental electric power and municipal water service which the water supply of the reclamation project makes feasible.
Notes and commentary — not statutory text
History
Acts 1971, 62nd Leg., p. 110, ch. 58, Sec. 1, eff. Aug. 30, 1971.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/WA/htm/WA.51.htm
- Text hash
- sha256 3343b2c26a0b87eab289c058b05a5c4c03c6f9c03438d4e2eef214b549bc84fe
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.