Tex. Water Code § 56.023 · Subchapter B. CREATION OF DISTRICT; CONVERSION TO ARTICLE XVI, SECTION 59, DISTRICT
MAP.
Text — Current through the 89th 2nd Called Legislative Session, 2025
(a) The engineer shall include with his report a map showing:
(1) the beginning point and outlets of canals, drains, ditches, and laterals;
(2) the length, width, depth, and slopes of the banks of any cut or excavation and the estimated number of cubic yards of earth necessary to be removed from each; and
(3) the location and size of levees and the estimated number of cubic yards of earth necessary to construct them.
(b) The engineer will comply sufficiently with Subsection (a) of this section if he describes the boundaries and provides the other information required by that subsection on a copy of the official land office map of the county in which the proposed district is located.
Notes and commentary — not statutory text
History
Acts 1971, 62nd Leg., p. 500, ch. 58, Sec. 1, eff. Aug. 30, 1971.
Source of truth
- Edition
- Current through the 89th 2nd Called Legislative Session, 2025
- Official file
- https://statutes.capitol.texas.gov/Docs/WA/htm/WA.56.htm
- Text hash
- sha256 4961a7b30962d500f5ccc725abc7d70e03e2bee2646c1192a9cdd9e65d2d228b
- Composed by
- compose_tx.py 2026-10-05: the Legislative Council's chapter files read in document order; verify_tx.py's independent reading (lxml DOM walk) agrees character for character
Procedural information only. Not legal advice and not a substitute for the advice of an attorney. Confirm the current text with the official publisher before relying on it.